Sr No
Name and Nature of Work
Principal
Location of Work
Value(In Lakh)
Year
1
11KV lines at various places in different sectors in Noida
Noida
Noida
92.11
2010
2
Providing L.T. Sub-station & HT/LT development of Village Momnathalla, Noida
Noida
Noida
70.15
2011
3
11 KV feeder line through underground for sector-15A from 33/11KV sub-station Sector-1, Noida
Noida
Noida
173.50
2011
4
L.T. Sub-station & HT/LT development of Village Shahdara Garhi, Noida
Noida
Noida
54.86
2011
5
L.T. Sub-station & HT/LT development of Village Kamnagar, Noida
Noida
Noida
64.01
2011
6
L.T. Sub-station & HT/LT development of Village Yakubpur- 2nd, Noida
Noida
Noida
863.00
2011
7
L.T. Sub-station & HT/LT development of Village Kondli, Noida
Noida
Noida
115.66
2011
8
Conversion of Rabit Conductor into dog conductor in Sector-19,27 &10, Noida
Noida
Noida
134.44
2011
9
Construction of 33KV double circuit line from 220KV sub-station Sector- 62 (NIB Chowk) to 33/11 KV Substation Sector-62 (Green Belt), Noida
Noida
Noida
1098.21
2012
10
Internal Electrification of Sport Stadium in Greater Noida
Noida
Noida
142.41
2012
11
Providing 11KV Feeder from 33/11 KV Sub-station Shastri Nagar, Ghaziabad
GDA
Ghaziabad
227.41
2012
12
Construction of 33KV line from 220KV sub-station Sector-129 to 33/11KV Sub-station Sector-82, Noida
Noida
Noida
748.04
2014
13
Work of Street Light on outer side of nagar palika marg in Old Delhi Hapur Road
HPDA
Hapur
109.66
2015
14
Construction of 33KV Feeder for 33/11KV S/s in Transport Nagar Scheme
HPDA
Hapur
15.60
2015
15
External Electrification & providing, street lighting arrangement in Sector-149,150,151 &152, Noida
Noida
Noida
1500.71
2016
16
Shifting of 11KV & 33KV overhead line Coming in the alignment of proposed cycle track on services road of Mahamaya Balika Inter College, Noida
Noida
Noida
657.28
2016
17
External Electrification work (underground system) in Sapna Type-1 Houses Sector-4A Mandola Vihar Yojna, Ghaziabad
UP AVP
Ghaziabad
629.04
2016
18
External Electrification work (underground system) in Sapna Type-2 Houses Sector-4A Mandola Vihar Yojna, Ghaziabad
UP AVP
Ghaziabad
552.01
2016
19
Lighting Arrangement Work on 24 Mtr Road in Transport Nagar Scheme
HPDA
Hapur
84.70
2016
20
Construction of 1x5 MVA, 33/11 VA Sub-station ALDI, Distt. Shamli along with associated 33KV & 11KV Lines
PVVNL
Shamli
312.05
2016
21
Construction of 1x5 MVA, 33/11 VA Sub-station Khandrawali, Distt. Shamli along with associated 33KV & 11KV Lines
PVVNL
Shamli
266.89
2016
22
Construction of 11KV lines feeder line from newly Constructed 33/11KV S/s Sector-93B to Sector-92, 93 and 93B, Noida
Noida
Noida
410.82
2016
23
System improvement, strengthening & augmentation for bringing down AT & C losses & improve consumer supply of Dadri towns under RAPDRP Part-B Scheme
PVVNL
Noida
894.87
2016
24
Work of lightning Arrangement in Garmukteshwer from Braj Ghat flyover to Toll Plaza on NH24
HPDA
Hapur
174.63
2017
25
Construction of 2x5 MVA, 33/11VA sub-station MANDOLA Loni, Distt. Ghaziabad along with associated 33KV & 11KV lines
PVVNL
Ghaziabad
565.68
2017
26
Supply & Installation of Single Phase Electronic energy meter (05-30A) (along with pilfer proof meter box & meters seal) outside the premises of rural consumers, along with supply & installation of 2 Crore 4 Sq mm Unarmored Service cable from pole to the energy meters of Consumers, on turnkey basis IN EDC-Ghaziabad
PVVNL
Ghaziabad
656.10
2019
27
Supply & Installation of Single Phase Electronic energy meter (05-30A) (along with pilfer proof meter box & meters seal) outside the premises of rural consumers, along with supply & installation of 2 Crore 4 Sq mm Unarmored Service cable from pole to the energy meters of Consumers, on turnkey basis IN EDC-Hapur.
PVVNL
Hapur
636.81
2019
Sr No
Name and Nature of Work
Principal
Location of Work
Value(In Lakh)
Year
1
Resurfacing of road (P/L BM & BC on kondly road xing of sector-57 & 54 to MP-2 road) Noida
Noida
Noida
198.48
2010
2
Resurfacing of road from Kasna to Gautam Budh Nagar University, Greater Noida
GNIDA
Greater Noida
225.60
2010
3
Work C/O 60m wide road and drain from ecotech-3rd, 60m wide road to plot no. -202, KP-V in Greater Noida
GNIDA
Greater Noida
340.08
2010
4
Resurfacing of both side main carriage of 130m wide road from 130m x 105m rotary to sector-37/sigma-2nd & omicron-2nd/1st rotary Greater Noida
GNIDA
Greater Noida
656.12
2010
5
Development of Sector 72 (BM and AC work on internal Roads) Noida
Noida
Noida
406.41
2011
6
Construction work of pump house & rising main of zone 1 to 7 in Madhuban Bapudham Yojna.
GDA
Ghaziabad
143.05
2011
7
Development of model Vill. Kasna, Greater Noida
GNIDA
Greater Noida
449.21
2011
8
Peripheral road drain & sewerage system around Sector- Zeta -2nd, Greater Noida.
GNIDA
Greater Noida
484.54
2011
9
Resurfacing of Sikandrabad Dankaur road km. 4.00 to 18.00, Greater Noida.2011
GNIDA
Greater Noida
599.08
2011
10
Resurfacing of DSC road from Noida (Vill. Kulesra) To Surajpur petrol pump (right side), Greater Noida
GNIDA
Greater Noida
735.08
2011
11
Main drainage work of Dalit Basti Sarvodaya Nagar Colony
GDA
Ghaziabad
320.20
2012
12
C/O C.C road & drain in Vill. Panchayat, Greater Noida.
GNIDA
Greater Noida
455.67
2012
13
Construction of left side carriage of 120m wide road from under pass at Ch.13.60 to Dhanori Village
YEIDA
Greater Noida
935.71
2012
14
M/O road (improvement of road near sector-14(A), Noida.
Noida
Noida
28.89
2013
15
Development of 6% abadi plots in vill. Kasna, Murshidpur and Gharara, Greater Noida.
GNIDA
Greater Noida
877.78
2013
16
Strengthening of road (upgradation & strengthening of internal road in sector-9) Noida
Noida
Noida
1060.22
2013
17
Strengthening of road (upgradation & strengthening of boarder road from Surya Nagar police station to Vivek Vihar) Delhi
GDA
Ghaziabad
533.28
2014
18
Up-gradation & strengthening of road from Raj Nagar flyover to Vivekanand flyover
GDA
Ghaziabad
672.36
2014
19
M/O road (up-gradation of internal road & drain in sector-2), Noida
Noida
Noida
1252.25
2014
20
D/O sector-152 (C/O 75mtr wide road between sector-152, 149 & 150), Noida
Noida
Noida
1923.70
2014
21
C/O Peripheral RCC Drain and box culvert sector Tech Zone 2 (Part A) Gr Noida
GNIDA
Greater Noida
924.78
2015
22
Construction of Drains and Sewages in Raj Nagar Extn. Under Circulation Plan on Estimated 45 Mtr Wide Road
GDA
Ghaziabad
288.73
2015
23
Construction of stud & marginal bund for protection of population and agricultural land of vill. Situated at banks of river ganga in distt. Haridwar.
Irrigation UK
Haridwar
1496.46
2015
24
Renewal work From BC for Old Delhi Nitipass Marg in Haridwar under Ard Kumbh Mela 2016
PWD UK
Haridwar
470.74
2016
25
C/O F-32 Type -64 Nos. Houses (G+3) in Samajwadi Avas Yojna at Jagriti Vihar Ext Sec-4, Scheme No 11, (Meerut)
UPAVP
Meerut
232.16
2017
26
C/o F-32 Type -128 Nos. Houses (G+3) in Samajwadi Avas Yojna at Jagriti Vihar Ext Sec-4, Scheme No 11, (Meerut)
UPAVP
Meerut
461.41
2017
27
Widening and strengthening of SPH (MDR) Road in Distt. Praygraj
PWD UP
Praygraj
2882.50
2018
28
Widening and strengthening of Soraon to Dahiyawan via Holagarh Road.
PWD UP
Praygraj
902.52
2019
29
Widening and strengthening of Nawabganj to Purabnara via Dahiyawan Road.
PWD UP
Praygraj
1294.92
2019
30
Widening and strengthening of Puranpur Tehsil to Kalinagar Tehsil Road Two Lane Connectivity in Distt.- Pilibhit Under Rajya Yojna
PWD UP
Pilibhit
1496.75
2019
31
Construction of Bareilly Mathura Road's km. 105(Naushera) to stadium, choti Jyarat, G.T.I. College Power House via Bareilly Mathura road's Km-97 Byepass under Rajya Yozna (Samanya) in Distt. Budaun
PWD UP
Badaun
4850.18
2019
32
Widening And Strengthening of Pachdevra Karchana- Gauhanik (Gauhania) Marg
PWD UP
Praygraj
1507.89
2020
33
Widening And Strengthening Sarail Akil Mahilla Link Road
PWD UP
Koshambi
1961.16
2020
34
Construction of Pilibhit Basti Marg's Km. 6 to Lipulek Bhind Marg Km 372 (Pilibhit Bypass)
PWD UP
Pilibhit
2554.36
2021
35
Widening and strengthening of Road from GIC to Atsaliya Railway Fatak in Distt Sahjahanpur
PWD UP
Sahjahanpur
1783.48
2021
36
Widening of existing road to 2 lane with paved shoulder from Hukanjuri to Khonsa section of NH-315A from design chainage Km 26.30 to Km 27.474 (Package- D) in the state of Arunachal Pradesh on EPC mode during 2019-20 [Job.No.-315A/Ar.P/2019-20/022]
NH P.W.D.
Khonsa, Arunachal Pradesh
2132.02
2022
37
C/o 2 Laning with Hard shoulder of Peren- Dimapur section on NH 129A from Design Km 109.494 to Km 126.775 (Length-17.281 Km) in the state of Nagaland on EPC mode (Package I) under NH(O)- TSP
NHIDCL
Dimapur, Nagaland
13591.18
2023
38
Widening & improvement of Imphal - Moreh section of NH 39 from km 406.000 to km 425.411 to two lane with paved shoulders configuration in the state of Manipur (Package IV) on Engineering and Procurement (EPC) mode
NHIDCL (through SKV)
Imphal, Manipur
5967.41
2023